Seidon reservoir dam :

Seidon reservoir dam is studying on the northeast of Khuzestan province . This study was started since 1998 .
Water supplying for agricultural lands , with area of about 9000 ha is the main reason for studying this dam .

Type of dam Earth dam
height above stream bed 57m
volume of storage 53.4mcm
  Balarood reservoir dam :

The first stage of studying about this dam was begun in 2000 .
Balarood reservoir dam is earth dam and located near Hosseynieh City in Khuzestan province .
Water supplying to agricultural lands of Andimeshk flat about 7000 ha , flood control of Balarood river and also conservation of lower areas against flood are the main purposes of this study .

Karoon waterway development project :

The importance of marine transport development , long record availability , variation in river bed and also quantitative & qualitative affects of water resources development projects are caused to consider these study projects on the Karoon River .

 
Khuzestan Rivers flood control project :

This project for foresight and presentation of floods on Khuzestan flat is under study . The main purposes of this are :

1) Installation of informative necessary systems and data collecting .
2) Reservoir operating .
3) Design of desired structures .
The importance activities were done to now :
1) Fluctuation recording on Karoon tidal and preparation of hydrography and topography on Bahmanshir river .
2) Bed sediment and island problems in Karoon River .
  Small surveys projects :

1) Water supplying and irrigation and drainage network of Laspid of Behbahan .
2) Water supplying and irrigation and drainage network of Sadat Hosseyni-Zede .
3) Water dupplying and irrigation and drainage network of Zavieh village in Dezful .
4) Artificial rechange of Ghaleh Tol plain .
5) Subsurface water of Dehdez plain .
6) Flood controlling for villages and lands on the east and west of Dez river in satisfaction .
     
A) kakheh basin studying projects:
No. Project Situation Area (ha) Consulting Eng.
1 Second stage studies of Arayes irrigation network plain North of  Soosangerd 28285 Mahab Ghods
2 Second stage studies of Dosalogh irrigation network plain West of  Shoosh 15859 Mahab Ghods
3 Second stage studies of Bagheh irrigation network plain North of  Soosangerd 7598 Mahab Ghods
4 First stage studies of Eyn Khosh & Fakeh irrigation network plain West of  Shoosh 29100 Mahab Ghods
5 Second stage studies of main networks of Dasht-e Azadegan (area 3) West of Ahwaz 15296 Saz - Ab Pardazan
6 First and second stage studies of main irrigation networks of Dasht-e-Azadegan (area 3) West of Ahwaz 21530 Saz - Ab Pardazan
7 Second stage studies of Chamran development network Southwest of Ahwaz 63355 Water & Soil Tehran
8 First and second stage studies of priming and conveyance of water to Dasht-e-Azadegan and south of Karkheh-noor Southwest of Ahwaz 86019 Mahab Ghods
9 Studing on hydraulically model of Hamidieh regulation dam West of Ahwaz - Water research center
10 kosar river intakes studing Northwest of Ahwaz 14150 Water & Soil Tehran
B) Great karoon basin studying projects:
No. Project Situation Area (ha) Consulting Eng.
1 Second stage studies of drainage on Abadan area Abadan 16000 Mahab Ghods
2 First and second stage studies of North Abadan irrigation and drainage network Khoramshahr
& Abadan
17000 Mahab Ghods
C) Zohreh basin studying projects:
No. Project Situation Area (ha) Consulting Eng.
1 First stage studies of Hendijan network Hendijan 34000 Dez ab
D) Jarahi basin studying projects:
No. Project Situation Area (ha) Consulting Eng.
1 Third stage of Jareh reservoir dam engineering services Ramhormoz 22000 Mahab Ghods
2 Inspection services for making hydromechanical equipment of jareh dam Ramhormoz 22000 Equipment of Iran water industry